October 25, 2025

Οpen Public Consultation – EIA Study for the development of 2 Agrivoltaic parks with BESS

agrivoltaic

Open Public Consultation – EIA Study for the development of 2 Agrivoltaic parks with BESS

SAOLA Ltd hereby announces its intention to construct and operate:  

  • Agrivoltaic (Agri-PV) Park with a capacity of 12,3 MWp, which will be supported by Battery Energy Storage System (BESS) rated at 12,3 MW / 31,5 MWh. The storage system is designed to operate in parallel with the PV installation. The development adopts a dual-land-use design, allowing the simultaneous generation of solar energy and ongoing agricultural activity. The proposed project will be located within the administrative boundaries of the Community of Alaminos. EIA is available here.
  • Agrivoltaic (Agri-PV) Park with a capacity of 1,8 MWp, which will be supported by Battery Energy Storage System (BESS) rated at 1,8 MW / 5 MWh. The storage system is designed to operate in parallel with the PV installation. The development adopts a dual-land-use design, allowing the simultaneous generation of solar energy and ongoing agricultural activity. The proposed project will be located within the administrative boundaries of the Community of Alaminos. EIA is available here.

As part of the public consultation process, local authorities, community councils, and members of the public are invited to express any concerns, opinions, or observations related to the projects.

Submissions should be sent via email to info[at]ideopsis.com within 30 calendar days from the date of this announcement. For more information you may call 22667794.

Your feedback is valued and will be taken into consideration in the development process

In this article:
As part of the public consultation process, local authorities, community councils, and members of the public are invited to express any concerns, opinions, or observations related to the projects
Share on social media:
Facebook
Twitter
LinkedIn
Telegram