August 8, 2025

Open Public Consultation – EIA Studies for the Development of 2 PV parks with BESS

Οpen Public Consultation pv

Οpen Public Consultation – Environmental Impact Assessment (EIA) Studies for the Development of Two Photovoltaic (PV) Parks with Battery Energy Storage Systems (BESS)

  • Construction and operation of a Photovoltaic (PV) Park by HELIOPEX 4 Ltd, with installed capacity of 1.43 MWp, which will be supported by a Battery Energy Storage System (BESS) rated at 0.5 MW / 1.0 MWh. The storage system is designed to operate in parallel with the PV park installation. The proposed project will be located within the administrative boundaries of the Community of Avdellero. EIA available here
  • Construction and operation of a Photovoltaic (PV) Park by HELIOPEX 5 Ltd, with installed capacity of 8 MWp, which will be supported by a Battery Energy Storage System (BESS) rated at 8 MW / 14 MWh. The storage system is designed to operate in parallel with the PV park installation. The proposed project will be located within the administrative boundaries of the Municipality of Athienou. EIA available here

As part of the public consultation process, local authorities, community councils, and members of the public are invited to express any concerns, opinions, or observations related to the projects.

Submissions should be sent via email to info[at]ideopsis.com within 30 calendar days from the date of this announcement. For more information you may call 22667794.

Your feedback is valued and will be taken into consideration in the development process. 

In this article:
As part of the public consultation process, local authorities, community councils, and members of the public are invited to express any concerns, opinions, or observations related to the projects.
Share on social media:
Facebook
Twitter
LinkedIn
Telegram